Electrical Engineering (EL) Group

The mandate concerns the electrical distribution network from 400 kV to 400/230 V. Its main missions are to operate, maintain, extend and renovate the network, analyse and make projections for CERN electrical energy consumption and manage relations with the energy suppliers.

 

The mandate also concerns the cabling activities. Its main missions are to install control cables, water cooled cables, and fibre optics for users. This activities include the management of infrastructures (cable trays, ducts, patch panels,etc.) and the necessary removal of old and unused installations.

 

EN-EL is also in charge of the controls of their distribution network.

EL

 

Video CERN Professions: Electricity at CERN, what a network: